Our main project for the day was to paint the exterior of one of the houses they use. It was an ugly pink color when we started and was a little less ugly brown when we finished:). But I guess it did look a little bit better. Unfortunately, the lift was broken and we weren't able to reach the highest section on one side of the house. Believe me, the engineering minds of the men tried to come up with a solution. But in the end, safety won out and they decided it wasn't worth the risk. There are at least 2 other houses at Agape House that still needed painted that we may try to tackle in the future (if they let us).
"A" and "D" getting the cracks.
The kids also helped rake up some of the leaves.
The second floor
"R" helping with the long pole.
"A" and "D" enjoying the yummy pizza the girls in the bakery make.